H2fl ow Controls
ProcessDefender™
45
Programming
H2fl ow Controls
ProcessDefender™
44
Programming
⊲
Menus 4.2.1 and 4.2.2 - Pre-Alarm Relay (R2) Overload and Underload
Trip response times
These menus relate to the response delays for either the process Overload (4.2.1) or
process Underload (4.2.2) condition. The response delay is the time-period that the
PD100 will take to respond once the load has exceeded the alarm levels that have been
set.
To make changes to 4.2.1, press the
button. Using the
and
buttons,
adjust the underlined number and then press the
button to accept the required
value and move to the next digit. Repeat until all digits are programmed and then press
the
button to accept the complete entry.
The screen will now show 4.3.1.
Fig.6.2
⊲
Menu 4.3.1 - Pre-Alarm Relay (R2) Latch
This menu relates to the
Pre-Alarm Relay Latch.
The factory default for the latch is
‘OFF’, which means that an alarm will cause the Pre-Alarm Relay (R1), to change state
while the alarm condition is present, but automatically default back to its normal state
when the motor load resumes a normal state. No Reset is required when the Relay
Latch is set to ‘OFF’.
To change the Latch to ‘ON’, fi rst press the
or
button. Now press the
or
buttons to change from ‘OFF’ to ‘ON’ and press the
button to accept the
change.
The screen will now show 4.3.2.
Fig.6.3