Page 65
Issue 05/2013
Installation of generator
Installation of dual-bearing generators (BG 160)
6.8.1
Installation dimensions and assembly
>
During assembly, observe the minimum clearances and specifications
for cooling.
Ö
Minimum clearances and cooling provisions, page 66
The generators vary according to the output and model.
If needed, request the drawing for your generator from
Generator.Technik.Systeme GmbH & Co. KG.
>
Secure the generator with at least four
mounting screws (minimum M12 or
comparable, bolt grade min. 8.8). The
attachment must be permanent and resistant
to shock and vibrations. Use suitable means to
prevent the screws from coming undone by
themselves, e.g. via a tension ring according to
DIN 128.
y
Tightening torque for mounting screws:
Torque 84 Nm for grade 8.8
y
Torque 120 Nm for grade 10.9
y
Permissible load of the shaft: Fr
max
= 5,000 N
(measured in 60 mm axial clearance from the
point where the shaft exits the bearing plate)
Fa
max
= 500 N
Important
►
Do not attach any third party parts to
the mounting profiles on the generator
housing.
4 Mounting screws
Fr
max
Fa
max
Summary of Contents for BG 132
Page 118: ...page 118...
Page 119: ...page 119...
Page 120: ...page 120...
Page 121: ...page 121...
Page 123: ...Page 123 Issue 05 2013...
Page 126: ...Synchronous generators of series DGG DWG and WG Issue 05 2013 Page 126...
Page 127: ...Page 127 Issue 05 2013...