Sy
nch
ro
no
us g
en
er
at
or
s o
f s
er
ie
s D
G
G
, D
W
G a
nd W
G
Issue 05/2013
Page 60
Installation of generator
Installation of dual-bearing generators (BG 132)
Assembly
Ö
Fig. 19, Assembly of flange mount
(dual-bearing, BG 132 model with reinforced bearing plate), page 60
>
Apply Loctite to the screw thread of the four screws
[2a]
and place
a toothed washer
[2b]
underneath the screw.
>
Place the flange
[1]
onto the generator and secure with four screws
[2a]
to
a tightening torque of 75 Nm.
>
Mount the coupling plate
[3]
on the shaft at the generator and prevent it
from twisting on the shaft with a key.
>
Secure the drive side of the coupling
[4]
to the drive and insert it into the
coupling plate. If necessary, while inserting, twist slightly until the gearing
locks.
>
Secure the flange
[1]
to the drive unit.
1
4x
2a
2b
3
4
2a
M12 x 40 DIN 933
2b
VH12 DIN 128
Fig. 19 Assembly of flange mount
(dual-bearing, BG 132 model with reinforced bearing plate)
Summary of Contents for BG 132
Page 118: ...page 118...
Page 119: ...page 119...
Page 120: ...page 120...
Page 121: ...page 121...
Page 123: ...Page 123 Issue 05 2013...
Page 126: ...Synchronous generators of series DGG DWG and WG Issue 05 2013 Page 126...
Page 127: ...Page 127 Issue 05 2013...