Sy
nch
ro
no
us g
en
er
at
or
s o
f s
er
ie
s D
G
G
, D
W
G a
nd W
G
Issue 05/2013
Page 52
Installation of generator
Installation of dual-bearing generators (BG 132)
6.7
Installation of dual-bearing generators (BG 132)
y
To install the dual-bearing generators with BG 132 model, proceed
according to the descriptions in this section.
y
Before installation, read the chapter on intended use, the general safety
instructions and the safety information in this chapter carefully and follow
the instructions and regulations given therein.
Ö
Ö
Ö
General safety instructions, installation, page 28
Warning
Risk of accident and injury
y
Incorrectly attached lifting equipment can lead to accidents.
►
Secure the lifting equipment to the generator exclusively
using the ring screws provided.
►
Only use suitable lifting equipment.
6.7.1
Installation dimensions and assembly
During assembly, observe the minimum clearances and specifications for
cooling.
Ö
Generator seal to the drive motor, page 40
Generator dimension
The generators vary according to the output and model.
IF needed, request the drawing for your generator from
Generator.Technik.Systeme GmbH & Co. KG.
>
Secure the generator with at least four
mounting screws (minimum M8 or
comparable, bolt grade min. 8.8).
The attachment must be permanent and
resistant to shock and vibrations.
>
Use suitable means to prevent screws from
coming undone by themselves, e.g. via
a tension ring in accordance with DIN 128.
Tightening torque for mounting screws
M = 25 Nm
4 Mounting screws
Summary of Contents for BG 132
Page 118: ...page 118...
Page 119: ...page 119...
Page 120: ...page 120...
Page 121: ...page 121...
Page 123: ...Page 123 Issue 05 2013...
Page 126: ...Synchronous generators of series DGG DWG and WG Issue 05 2013 Page 126...
Page 127: ...Page 127 Issue 05 2013...