![GSi TopDry Autoflow Construction Manual Download Page 81](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071081.webp)
Chapter 7: TopDry Drying Floor
Chute Chain Assembly
The chute chains are attached to the lift plate. Floor sheets with two chutes can have two chains
connected to the same hole on the lift plate.
1. Pass the cable (C) through the center hole of the lift plate (A) and install the cable clamp (B).
Figure 7-19
Installing the lift plate
A
Lift plate (TD-100801)
D
Pulley
B
Cable clamp (S-4693)
E
12 in. when chutes are level (closed position)
C
Cable (TD-100231)
F
Holes to connect the chain
2. Install the chains (G) to the lift plate (A) using the “S” hooks (H) and crimp the “S” hooks (H).
NOTE:
Make sure that the chains (G) are installed only in the holes as shown (F).
3. Install all the chains (G) from the lift plate (A) to the chutes (I) using the “S” hooks (H).
NOTE:
Keep approximately 2 ft. of excess chain (J) at the chutes (I).
4. Adjust the chains (G) until the chutes (I) are level, when the lift plate (A) is in the closed (up)
position.
PNEG-4936
36 Ft. TopDry Autoflow
81
Summary of Contents for TopDry Autoflow
Page 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Page 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Page 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Page 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Page 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...