![GSi TopDry Autoflow Construction Manual Download Page 25](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071025.webp)
Figure 2-3
Location of TopDry components and accessories - Side view
A
Fill system no. 2
N
Control fan/heater
B
Fill system no. 1
O
Plenum temperature sensor
1
C
Aeration fan
2
P
Fan/heater (secondary)
D
TopDry drying bin
Q
TopDry Terminal control mounted at eye level
E
Grain temperature sensors
R
Cable route
F
Drying chamber rotary switch
S
Chute controller
G
Eave platform
T
Fill system control mounted at eye level
H
Ladder
U
Wet supply rotary switch (optional)
I
Plenum high-limit sensor
13
V
Wet storage bin
J
Storage chamber platform
W
Control fan/heater duct
K
Storage chamber rotary switch
134
X
Secondary fan/heater duct
L
Mount even with fan/heater
Y
Storage chamber door
M
Grain temperature sensor junction box
13
PNEG-4936
36 Ft. TopDry Autoflow
25
1.
Must be in this location between the first two stiffeners to the right of the fan for proper operation.
2.
Must not be placed within 90° of a fan or burner.
3.
Must be at platform or optional ladder and platform will be required.
4.
Must be mounted 3 ft. below heat duct opening.
Summary of Contents for TopDry Autoflow
Page 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Page 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Page 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Page 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Page 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...