![GSi TopDry Autoflow Construction Manual Download Page 33](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071033.webp)
Duct and Drying Fan Pad
1. The top of this pad must be level with the top of the bin’s foundation.
2. Recommended pad thickness is 4 in. minimum.
3. Front of pad must be perpendicular to bin wall.
CAUTION
The fan foundation and fan must be level and smooth for proper operation. Improper
leveling can cause vibration problems.
Figure 3-6
Duct and drying fan foundation
A
Bin wall
B
Center line of bin
PNEG-4936
36 Ft. TopDry Autoflow
33
Summary of Contents for TopDry Autoflow
Page 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Page 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Page 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Page 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Page 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...