Chapter 7: TopDry Drying Floor
Installing the Chute Hopper and Intermediate Chute Bracket
1. Place the chute hopper (A) under the drying floor sheet (D) and align it with the pre-punched
rectangular opening.
2. Place a flashing angle (B) on top of the drying floor sheet (D) across the outer edge of the hopper
entrance with the interior of the angle facing the sidewall.
3. Install the flashing angle (B) and the chute hopper (A) to the drying floor sheets (D) using
5/16 x 3/4 in. self-tapping screws (C).
4. Place the intermediate chute bracket (E) under the drying floor sheet (D) and align with the matching
opening in the floor sheet.
5. Attach the intermediate chute bracket (E) to the drying floor sheet (D) using 5/16 x 3/4 in.
self-tapping screws (C).
Figure 7-9
Installing the chute hopper and intermediate chute bracket
A
Chute hopper (TD-100647)
D
Floor sheet (TD-100738)
B
Flashing angle (TD-100654)
D
Floor sheet with intermediate chute
(TD-100739)
C
5/16 x 3/4 in. self-tapping screw (S-7221)
E
Intermediate chute bracket (TD-100078)
70
PNEG-4936
36 Ft. TopDry Autoflow
Summary of Contents for TopDry Autoflow
Page 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Page 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Page 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Page 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Page 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...