![GSi TopDry Autoflow Construction Manual Download Page 29](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071029.webp)
Foundation Forms
Circular foundation forms are commonly used for stiffened farm bins.
Figure 3-2
Circular form
A
Footing trench
B
Carpenter’s level
Placing the Reinforcement
1. Once the forms and trench have been prepared, begin placing the reinforcement rods and mesh in
the foundation’s footing. Make sure the reinforcement rods are properly lapped by wiring.
2. Place at least 2 in. of compacted sand on the inside section of the foundation to provide a good
base for the concrete and to protect against rodents.
3. Cover the sand with 4 ml. polyethylene plastic, which will act as a moisture barrier.
4. Add two layers of 6 x 6 in. wire mesh to the entire area of the foundation slab or the entire foundation
for monolithic systems to complete the preparation of the bin’s foundation.
PNEG-4936
36 Ft. TopDry Autoflow
29
Summary of Contents for TopDry Autoflow
Page 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Page 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Page 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Page 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Page 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...