Assembling the Cross Over Platform
The cross over platform assembly is used when stairs are installed.
1. Assemble the floor braces (B) to the platform support (A) using 5/16 x 3/4 in. truss head screws (J)
and 5/16 in. hex nuts (K).
2. Install the assembled platform support (A) to the sidewall brace (C) and support brace (D) using
5/16 x 3/4 in. truss head screws (J) and 5/16 in. hex nuts (K).
3. Field drill sixteen 3/8 in. holes on the sidewall for each sidewall brace (C). Install the sidewall brace
(C) along with the platform support (A) to the sidewall using 5/16 x 1 in. flange bolts (I) and 5/16 in.
hex nuts (K).
4. Install the platform floor (E) to the platform support (A) using 5/16 x 3/4 in. truss head screws (J) and
5/16 in. hex nuts (K).
5. Install the platform vertical angles (F) and handrails (G) on the platform support (A) using
5/16 x 3/4 in. truss head screws (J) and 5/16 in. hex nuts (K).
6. Install the handrail braces (H) to the platform vertical angles (F) and the sidewall using 5/16 x 1 in.
flange bolts (I) and 5/16 in. hex nuts (K).
Figure 11-3
Assembling the cross over platform
A
Platform support (TDP-5009)
G
27 in. handrail (TDP-5001)
B
Floor brace (TDP-5004)
H
Handrail brace (TDP-5003)
C
Sidewall brace (TDP-5008)
I
5/16 x 1 in. flange bolt with sealing washer (S-10260)
D
Support brace (TDP-5007)
J
5/16 x 3/4 in. truss head screw with sealing washer
(S-10267)
E
Platform floor (TDP-5006)
K
5/16 in. hex nut (S-396)
F
Platform vertical angle (LS-371)
132
PNEG-4936
36 Ft. TopDry Autoflow
Summary of Contents for TopDry Autoflow
Page 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Page 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Page 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Page 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Page 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...