DC INVERTER MULTI VRF INSTALLATION
90
system free of leakage.
5. Add a dual-way filter on liquid pipe side.
6. For multiple systems, please mark them properly.
Carry out leakage detection under pressure after welding.
Purge and make leakage
detection under pressure
1. Purge the system clean.
2. Keep the pressure for 24 hours
Except for the influence by temperature, it is deemed
acceptable if pressure drop is within 0.02MPa. (With the
temperature change by 1?, the pressure will change by
approx. 0.01MPa).
Thermal insulation
1. The thermal insulation tube must meet the specifications.
2. Seal between the thermal insulation pipes to avoid air
entry.
Installation of outdoor unit
1. Select the installing position correctly.
2. Build the foundation according to the anchor bolt position
and the dimension of outdoor unit;
3. Build the damping device properly.
4. Avoid sharp knock when handling the outdoor unit. The
inclination angle shall not be higher than 15°
Connection of indoor unit and outdoor unit
1. Tighten the nuts;
2. Provide proper protection to the outdoor connection pipe,
communication wires and power supply.
Leakage detection under pressure
Keep the pressure for 24 hours. Except for the influence by
temperature, it is deemed acceptable if pressure drop is within
0.02MPa. (With the temperature change by 1
℃
, the pressure
will change by approx. 0.01MPa).
Vacuuming
1. Establish vacuum simultaneously in the gas pipe and
liquid pipe;
2. The vacuuming time shall be long enough.
Put still for 1 hour after vacuuming. It is deemed acceptable if
the pressure will not rise.
Add refrigerant
Add refrigerant according to the volume as specified on the
engineering drawing.
Open the valve of outdoor unit
Commissioning of complete unit
Remarks:
1) Described above are general working procedures. The procedures might vary with the site conditions.
2) For detailed installation rules, please see the description in each chapter.
Summary of Contents for GMV(L)-Pd100W/NaB-K
Page 1: ...1 DC INVERTER MULTI VRF Service Manual GREE ELECTRIC APPLIANCES INC OF ZHUHAI ...
Page 4: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 1 PRODUCT ...
Page 40: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 37 CONTROL ...
Page 41: ...DC INVERTER MULTI VRF CONTROL 38 CONTROL 1 OPERATION FLOWCHART ...
Page 43: ...DC INVERTER MULTI VRF CONTROL 40 1 2 Heating Operation ...
Page 70: ...DC INVERTER MULTI VRF CONTROL 67 2 Frame Diagram of System Net 上 WC ...
Page 90: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 87 INSTALLATION ...
Page 115: ...DC INVERTER MULTI VRF INSTALLATION 112 ...
Page 159: ...DC INVERTER MULTI VRF MAINTENANCE 156 MAINTENANCE ...
Page 179: ...DC INVERTER MULTI VRF MAINTENANCE 176 ...
Page 212: ...DC INVERTER MULTI VRF MAINTENANCE 209 2 GMV L R90T Na K GMV L R112T Na K GMV L R125T Na K ...
Page 216: ...DC INVERTER MULTI VRF MAINTENANCE 213 2 GMV L R40P Na K GMV L R45P Na K GMV L R50P Na K ...
Page 224: ...DC INVERTER MULTI VRF MAINTENANCE 221 2 GMV L R36G NaB K GMV L R45G NaB K ...
Page 226: ...DC INVERTER MULTI VRF MAINTENANCE 223 3 GMV L R50G NaB K GMV L R56G NaB K ...
Page 228: ...DC INVERTER MULTI VRF MAINTENANCE 225 4 GMV L R71G Na K GMV L R80G Na K ...
Page 230: ...DC INVERTER MULTI VRF MAINTENANCE 227 5 GMV L R22G NaC K GMV L R28G NaC K ...
Page 232: ...DC INVERTER MULTI VRF MAINTENANCE 229 6 GMV L R36G NaC K GMV L R45G NaC K ...
Page 237: ...DC INVERTER MULTI VRF MAINTENANCE 234 2 GMV L R71Zd Na K ...
Page 240: ...DC INVERTER MULTI VRF MAINTENANCE 237 3 GMV L R90Zd Na K GMV L R112Zd Na K GMV L R125Zd Na K ...