Operation order
Basic procedures for welding:
a. Cleaning of portions for braze welding
Polishing……………………Removing metal materials at connection portion. (Removing
oxidation film using non-woven fabric, abrasive cloth or abrasive paper)
Ungrease……………………If any oil stain is existent, acetone or spirit solvent shall be used for
ungrease treatment.
At the same time, compressed air at 0.8MPa (gauge pressure) shall be used for cleaning. The
cleaning shall be repeated not less than 3 times, until there is no dirt discharged.
b. Check whether clearance between pipe and connector is proper.
Put the connector into the pipe and face downward. If the connector does not fall down
depending on friction force, the clearance is considered proper.
c. Nitrogen-filled protection
●
Since vigorous oxidation would occur on the surface of copper pipe at braze welding
temperature, to effectively restrain the generation of oxide coating in copper pipe,
nitrogen-filled protection for copper pipe is necessary.
●
After copper pipes are assembled, nitrogen shall be filled in copper pipe connectors.
●
Method for charging nitrogen into copper pipe
Nitrogen charging method
:
:
:
:
Pressure is 0.05~0.3MPa. Nitrogen flow of 4~6L/min (gas flow can be sensed by hand) shall
be guaranteed to charge in work pieces.
Assemble copper
pipes
Cleaning
Check whether clearance
is proper.
Fill nitrogen N2
Nitrogen pressure 0.05-0.3Mpa 0.5
±
0.1kgf/cm
2
Welding flux
Acknowledge
welding flux
Add welding flux
Cooling, continue to fill nitrogen
for over 10s
Shut off nitrogen
Welding heating
Make visual inspection to
the weld quality
Summary of Contents for GMV(L)-Pd100W/NaB-K
Page 1: ...1 DC INVERTER MULTI VRF Service Manual GREE ELECTRIC APPLIANCES INC OF ZHUHAI ...
Page 4: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 1 PRODUCT ...
Page 40: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 37 CONTROL ...
Page 41: ...DC INVERTER MULTI VRF CONTROL 38 CONTROL 1 OPERATION FLOWCHART ...
Page 43: ...DC INVERTER MULTI VRF CONTROL 40 1 2 Heating Operation ...
Page 70: ...DC INVERTER MULTI VRF CONTROL 67 2 Frame Diagram of System Net 上 WC ...
Page 90: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 87 INSTALLATION ...
Page 115: ...DC INVERTER MULTI VRF INSTALLATION 112 ...
Page 159: ...DC INVERTER MULTI VRF MAINTENANCE 156 MAINTENANCE ...
Page 179: ...DC INVERTER MULTI VRF MAINTENANCE 176 ...
Page 212: ...DC INVERTER MULTI VRF MAINTENANCE 209 2 GMV L R90T Na K GMV L R112T Na K GMV L R125T Na K ...
Page 216: ...DC INVERTER MULTI VRF MAINTENANCE 213 2 GMV L R40P Na K GMV L R45P Na K GMV L R50P Na K ...
Page 224: ...DC INVERTER MULTI VRF MAINTENANCE 221 2 GMV L R36G NaB K GMV L R45G NaB K ...
Page 226: ...DC INVERTER MULTI VRF MAINTENANCE 223 3 GMV L R50G NaB K GMV L R56G NaB K ...
Page 228: ...DC INVERTER MULTI VRF MAINTENANCE 225 4 GMV L R71G Na K GMV L R80G Na K ...
Page 230: ...DC INVERTER MULTI VRF MAINTENANCE 227 5 GMV L R22G NaC K GMV L R28G NaC K ...
Page 232: ...DC INVERTER MULTI VRF MAINTENANCE 229 6 GMV L R36G NaC K GMV L R45G NaC K ...
Page 237: ...DC INVERTER MULTI VRF MAINTENANCE 234 2 GMV L R71Zd Na K ...
Page 240: ...DC INVERTER MULTI VRF MAINTENANCE 237 3 GMV L R90Zd Na K GMV L R112Zd Na K GMV L R125Zd Na K ...