DC INVERTER MULTI VRF INSTALLATION
120
6.5 Management and Machining of Refrigerant Piping
1
)
)
)
)
Storage
After receiving the refrigerant pipe and other components, do not move them to the storage
until confirming that they have no deformation, bend, crack or damage.
The pipe end must be sealed to prevent the invasion of moisture or wastes.
The copper pipe with coating may become deformed under the compression of the coating
material, so that the coils shall be placed upright.
To avoid the invasion of moisture or wastes, a support higher than the ground must be built
by using woods.
Care of pipe end during construction
The pipe ends must be well cared during construction. According to the working position, work
progress and surrounding environment, the most effective way is to seal the end and wrap with
adhesive tape.
i.
Sealing method
Clamp the pipe end to flat and weld on the clearance. Then, charge nitrogen 2
~
5kgf/cm
2
. This will be more effective.
ii.
Method for wrapping with adhesive tape
Seal the pipe end with ethylene tape.
2
)
)
)
)
Coil unwinding
CAUTION:
When unwinding the coil, take care not to drag it on the ground. The coil shall be slowly
unwound on ground without any twisting. In case of excessive compression by any
hard object during unwinding, the thermal insulation materials may be damaged and
cannot be recovered, which will deteriorate the performance of thermal insulation. Do
not unwind carelessly. Otherwise, the fitting pipe might be flattened.
The copper pipe shall be rounded if the pipe end is deformed.
(The higher the size, the higher the possible deformation)
3
)
)
)
)
Measuring of pipe
(To reduce the resistance and length of copper pipe), the dimension of main refrigerant pipe
shall be so taken that the bends shall be minimized, the radius of bend section shall be
increased and the upstream and downstream section shall be reduced. Use the method that
can reduce the actual length and equivalent length of the copper pipe.
Sometimes the connection pipe of indoor unit must be adjusted due to the relation with
accessories, drainage hose and connection surface. Therefore, a fairly marginal
dimension shall be taken.
Clamp the pipe end and weld on it.
Summary of Contents for GMV(L)-Pd100W/NaB-K
Page 1: ...1 DC INVERTER MULTI VRF Service Manual GREE ELECTRIC APPLIANCES INC OF ZHUHAI ...
Page 4: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 1 PRODUCT ...
Page 40: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 37 CONTROL ...
Page 41: ...DC INVERTER MULTI VRF CONTROL 38 CONTROL 1 OPERATION FLOWCHART ...
Page 43: ...DC INVERTER MULTI VRF CONTROL 40 1 2 Heating Operation ...
Page 70: ...DC INVERTER MULTI VRF CONTROL 67 2 Frame Diagram of System Net 上 WC ...
Page 90: ...GREE COMMERCIAL AIR CONDITIONER DC INVERTER MULTI VRF 87 INSTALLATION ...
Page 115: ...DC INVERTER MULTI VRF INSTALLATION 112 ...
Page 159: ...DC INVERTER MULTI VRF MAINTENANCE 156 MAINTENANCE ...
Page 179: ...DC INVERTER MULTI VRF MAINTENANCE 176 ...
Page 212: ...DC INVERTER MULTI VRF MAINTENANCE 209 2 GMV L R90T Na K GMV L R112T Na K GMV L R125T Na K ...
Page 216: ...DC INVERTER MULTI VRF MAINTENANCE 213 2 GMV L R40P Na K GMV L R45P Na K GMV L R50P Na K ...
Page 224: ...DC INVERTER MULTI VRF MAINTENANCE 221 2 GMV L R36G NaB K GMV L R45G NaB K ...
Page 226: ...DC INVERTER MULTI VRF MAINTENANCE 223 3 GMV L R50G NaB K GMV L R56G NaB K ...
Page 228: ...DC INVERTER MULTI VRF MAINTENANCE 225 4 GMV L R71G Na K GMV L R80G Na K ...
Page 230: ...DC INVERTER MULTI VRF MAINTENANCE 227 5 GMV L R22G NaC K GMV L R28G NaC K ...
Page 232: ...DC INVERTER MULTI VRF MAINTENANCE 229 6 GMV L R36G NaC K GMV L R45G NaC K ...
Page 237: ...DC INVERTER MULTI VRF MAINTENANCE 234 2 GMV L R71Zd Na K ...
Page 240: ...DC INVERTER MULTI VRF MAINTENANCE 237 3 GMV L R90Zd Na K GMV L R112Zd Na K GMV L R125Zd Na K ...