•Page
globalcontract.com
9
• Summer 2017
GLOBAL
Contract
5
INSTALLATION GUIDELINES
Diet Freestanding Panel Mobile Kit
STEP 1: Remove levelers from the bottom of the panel vertical extrusion.
STEP 2: Align the bracket so the legs with the casters run perpendicular to the length
of the panel.
STEP 3: Slide the bracket up until it fi ts into the horizontal bottom rail.
STEP 4: Remove the PVC cover and screw the bracket to the panel vertical through
the second bottom hole.
STEP 5: Re-attach the levelers.
1
3
4
2
5