Page
•
globalcontract.com
28
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Open shelf must always be supported by three panels set in a “U” confi guration.
The Open shelf can be installed into any horizontal, panel integrated rail, but it
must never be installed on top of glazed, or semi-glazed panels.
The shelf is provided with two, permanently attached brackets at the back.
STEP 1: Insert both rear brackets into panel’s horizontal rail while supporting the
open shelf in a tilted position.
STEP 2: Once the shelf’s brackets are securely seated inside of the rail bring the
shelf into a level position.
Have your assistant support the shelf in a horizontal position while you install
side brackets.
STEP 3: Insert the bracket into horizontal rail in adjacent, perpendicular panel,
rotate
the bracket upward while making sure that it is securely seated inside of the rail.
STEP 4: Align the bracket with two holes in the shelf and secure it driving the
supplied screws from the top, through the shelf and into the bracket.
Repeat the procedure to install the second bracket on the opposite side.
Check bracket attachments for safety. Make sure that all screws are properly
tightened, but not stripped and the whole assembly is structurally sound to
prevent dislodgement and potentially cause personal injury or property
damage.
Open Shelf
1
2
3
4