•Page
globalcontract.com
19
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Diet Cable Manager
Determine length of individual Cable managers and stage them accordingly, as
specifi ed on your plan, in the proximity of their future location.
1) Lay the cable manager fl at underneath the panel and lay cable bundles on top
of it. Divide the bundles so that roughly equal amount of cables passes on either
side of the panel leg. This will prevent manager from bulging.
2) As you proceed lifting the manager from the fl oor, ensure that a notch in
the manager’s bottom fi ts over internal edge of the panel leg. This will keep the
manager’s sides in a vertical position.
3) Press upper edges of the cable manager into groves on both sides of panel’s
bottom rail.
NOTE: If you use a full depth pedestals ( 24” deep pedestal under 24” deep
worksurface), you may have to slide the pedestal partially out in order to gain an
access to the panel’s cable manager. Diet worksurfaces are provided with two
cutouts to allow for a cord plug to pass between fl oor and worksurface.
4) Thread cord plug through the cutout.
5) Position cable in the gap between worksurface and panel as required.
6) Use Viceversa optional Cable snake to organize cables between worksurface
level and fl oor standing CPU or Diet panel cable manager. Surge protected power
bars (DABAR) are provided with mounting keyholes at the back.
7) Establish location of power source, route power bars cord through cable
managers and
8) position underneath the worksurface where the length of the cord allows (pref-
erably in near proximity of the rear cutouts). Measure distance between keyholes
on the Power bar and drive two #6x3/4” wood screws with pan head partially into
the bottom of the worksurface. Slide the Power bar over the screws and ensure a
secure fi t.
NOTE: Power bar is also available with a bracket that secures it to panel’s horizon-
tal rails..
9) Plug the cord.
NOTE: Do not connect multiple power bars into one, single-circuit outlet without
ensuring that the total, combined power consumption of all connected equipment
is NOT going to exceed 15 Amps (Canada) or 20 Amps (USA).
WARNING: It is recommended that the installation of the electrical system be
made under the supervision of a licensed electrician and in accordance with
applicable codes and regulations. Hard wired connection to the building power
supply must be done only by a licensed electrician. Do not connect or disconnect
components while the system is under load. Disconnect the main power supply
before servicing or reconfi guration.
4
6
8
9
7
5
3
1
2