•Page
globalcontract.com
27
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Ensure that all panels are leveled and securely connected before proceeding with
installation of storage units.
Determine type and location of individual storage units and stage them accord-
ingly, as specifi ed on your plan, in the proximity of their future location.
STEP 1: Open shelf
STEP 2: Off-module shelf
STEP 3: Panel / table shelf
STEP 7: Install individual free standing storage units as specifi ed on your plan.
Storage
1
2
3