•Page
globalcontract.com
29
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
STEP 1: Secure a side hanging arm to either side of the shelf by driving supplied
machine screws through the shelf, into the arms.
STEP 2: Insert top of the hanging arms into panel’s top or mid horizontal rail.
STEP 3: Adjust side-to-side location and release.
Ensure that the hanging arms top is securely seated inside of the rail.
STEP 1: Drive shelf support feet with suction cups into threaded sockets under-
neath the shelf.
STEP 2: Insert the shelf’s top horizontal fl ange into top horizontal rail (42” high
panel only) or a slat wall panel element.
STEP 3: While still holding the shelf in angled position, slide it sideways to fi nalize
its location.
STEP 4: Lower the front of the shelf to allow the support feet to rest on the
worksurface.
NOTE: When using this shelf on a free standing panel and an independent, free
standing table, use panel and table levelers to level the shelf. WARNING: This
unit will not be safe nor functional when installed in a horizontal rail of any height
without the use of the front support feet.
Off - Module Shelf
Off - Module Shelf
1
1
2
2
3
3
4