•Page
globalcontract.com
17
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Data and communication cables distributed above ceiling grid typically descend
through a Power Pole and enter the Diet raceway cavity either through a gap between
Diet Raceway Cover at any panel junction, or between the Raceway Cover and the
Raceway Junction Cover.
Similarly, data/communication cables originating in the wall or a fl oor monument
enter the Diet raceway cavity either through a gap between the Diet Raceway Cover at
any panel junction, or between the Raceway Cover and the Raceway Junction Cover.
Horizontal cable distribution is managed by the Raceway Cover, which opens up on
the fl oor, allowing for cable lay-in (cable bypass on the outside of the panels junction
point).
Partial knock-outs (2.67” wide x 1.360” high) provided in each Raceway Cover ac-
commodate terminal plates from various vendors.
RACEWAY JUNCTION COVER INSTALLATION:
It is recommended that data cables and power conduits pass from one panel to
another on the same side of the panel.
Universal Raceway Junction Cover accommodates in-line (180o) panels as well as
off-module, “cross” panel confi gurations:
STEP 1: Insert the upper lip into the panel’s bottom horizontal extrusion.
STEP 2: Slide two rectangular anchor nuts with supplied screws up the groove in the
panel’s vertical frame member and tighten.
Check the complete installation.
Diet Data/Communication installation
2
1