Page
•
globalcontract.com
6
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Diet to Boulevard Slot Connector
The kit consists of : 2 brackets
2 screw anchors
2 # 10-24x3/8” pan head machine screws
2 # 10 lock washers
Ensure that the complete BOULEVARD panel run is level before proceeding
with connecting perpendicular Diet panels.
STEP 1: Slide one screw anchor into panel’s vertical groove and secure it temporarily
below the panel’s top corner cap.
STEP 2: Install the bottom bracket with downward pointing hooks.
STEP 3: Align top of the bottom bracket with the top of the horizontal gap in panel’s bot-
tom rail as illustrated. ensure that both bracket tabs (A) are engaged behind aluminum
lip if panel’s vertical frame member.
STEP 4: Slide one screw with screw anchor up into panel’s vertical groove, into bracket’s
slot and secure by tightening the screw.
STEP 5: Lift the Diet panel and hook it with the secured bottom bracket into slots on
perpendicular Boulevard panel.
STEP 6: Level Diet panel.
STEP 7: Align top bracket’s upward pointing hooks with slots in perpendicular Boulevard
panel while making sure that both bracket’s tabs (B) are engaged behind aluminum lip of
Diet panel’s vertical frame member.
STEP 8: Slide the bracket up until it’s hooks are fully engaged in Boulevard panel slots.
STEP 9: Secure the bracket by tightening the top screw.
3
1
2
5
6
8
B
7
9
4
A