Page
•
globalcontract.com
20
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Ensure that all panels are leveled and securely connected before proceeding with
installation of worksurfaces.
Determine type, size and location of worksurfaces.
Determine type and location of worksurface supports and stage them accordingly, in
the proximity of their future location.
Proceed by installing and leveling each consecutive worksurface support and work-
surface in location specifi ed on your plan.
STEP 1: Worksurface universal bracket
STEP 2: Worksurface fl at bracket
STEP 3: Gable leg
STEP 4: Pedestal bracket
STEP 5: Corner plate
STEP 6: Transaction top
STEP 7: Off-module support with fi xed height Viceversa legs and Worksurface
universal brackets
Worksurface Support
2
1
3
4
5
6
7