37
Fire Suppression System
6
Fire Suppression System
6 - 1 System Description
The fire suppression system used in your Giles Ventless Hood Fryer is an Ansul R-102 Restaurant Fire
Suppression System (Standard UL 197 Listed).
Final installation, charging and testing of the system is
to be performed by an authorized Ansul distributor in accordance with the systems listing.
The fire suppression system is designed and UL listed to provide fire protection for cooking appliances
such as fryers. It protects your units, automatically 24 hours per day. The system contains piping, nozzles
(both appliance and plenum), and conduit for routing the fusible link cable through the hood.
WARNING
To insure adequate fire protection, DO NOT attempt to cook on this fryer without the fire
suppression system installed or serviced!
6 - 2 Installation
Factory Installed
Installed by Ansul Distributor
1. Piping
1. Fusible links
2. Appliance and Plenum Nozzles
2. Wire Rope
3. Tank and mounting bracket
3. R-102 Suppression agent
4. Release Mechanism
4. Charging cylinder
5. Conduit for fusible links
5. Remote pull station (if required)
6. Detector Brackets
7. Pulleys & elbows
IMPORTANT NOTE:
The appliance and plenum nozzles have been factory installed in the proper operating position.
DO NOT
MOVE OR ADJUST.
(If nozzles move during cleaning, re-set to the following locations)
Model
Nozzle Direction In Relation to the Front of the Cooking Vat
CF-400
Center of Vat
CF-500
Center of Vat
*Ansul is a registered trademark
Model No. Prot. Area
Nozzle P/N
Quantity
Description
Fusible Link
Temp. Rating
CF-400 VH
Appliance
Ansul P/N 56929
2
1
⁄
2
N
Globe Tech 317135
135°F
Plenum
Ansul P/N 56929
2
1
⁄
2
N
Ansul 56811
165°F
CF-500 VH
Appliance
Ansul P/N 56929
2
1
⁄
2
N
Globe Tech 317135
135°F
Plenum
Ansul P/N 56929
2
1
⁄
2
N
Ansul 56811
165°F
!
Summary of Contents for Chester Fried CF 400
Page 10: ...7 Operating Instructions ...
Page 16: ...13 Fryer Components and Their Function Cooking Vessel Figure 3 3 6 2 1 5 4 ...
Page 29: ...26 Preparing the Fryer for Operation Filter Pan Shown with Drain Hose Attached Figure 7 ...
Page 39: ...36 Preparing the Fryer for Operation Figure 11 VH Series ...
Page 46: ...43 Fire Suppression System 6 6 Illustrations Fire Suppression Plumbing Diagram ...
Page 48: ...45 Fire Suppression System 6 6 Illustrations Fusible Link Conduit Diagram ...
Page 50: ...47 Fire Suppression System 6 6 Illustrations Manual Pull Conduit Diagram ...
Page 52: ...49 Fire Suppression System 6 6 Illustrations Fire Suppression Conduit Diagram ...
Page 79: ...76 Wiring Model CF 400 500 1 3 Phase 10 13 Wiring Schematic ...