
140
GSM19 Series Magnetometers - Version 7
GEM Systems, Inc. Advanced Magnetometers
For more technical information, visit www.gemsys.ca
1.
From the survey menu, select cycling rate, tuning, time and other parameters in the normal way.
2.
Connect the sensor(s) and, if required, the GPS antenna.
3.
Press
A-start
to proceed.
NOTE:
If tune initialize is set to YES, it is activated at this point. Make sure the sensors
are connected to the unit. Otherwise, tune initialization fails and this affects all
the scheduled base surveys.
Programmable bases can be operated in three different modes:
•
Immediate
•
Daily
•
Programmable
The screen for the base mode used in the last survey is displayed. Press
E-new-mode
to change the
base mode
SCREEN G3
base start
A-immediate
B-daily
C-programmable D-RS-232