![Geko 12V 4000 G 41 Operating Instructions Manual Download Page 70](http://html1.mh-extra.com/html/geko/12v-4000-g-41/12v-4000-g-41_operating-instructions-manual_2206052070.webp)
12
Valve Gear
Valve clearance adjustment
1. Release locknut (1).
2. Insert feeler gauge between valve bridge and
rocker arm.
3. Using Allen key, set adjusting screw (2) so that
the specified valve clearance is provided.
4. Feeler gauge must just pass through the gap.
5. Tighten locknut (1) to 90 + 9 Nm, holding
adjusting screw (2) firm.
6. Replace or rectify adjusting screws and/or
locknuts which do not move freely.
7. Check valve clearance.
Final steps
1. Remove barring tool ( Page 6 1).
2. Install cylinder-head cover ( Page 6 12).
6.4.3
Cylinder-head cover removal and installation
Preconditions
Engine is stopped and starting disabled.
Special tools
Designation / Use
Part No.
Qty.
Torque wrench
TC
Spare parts
Designation / Use
Part No.
Qty.
Gasket
SPC
M015403/00E 02-09
© MTU
www.generent.ru
Summary of Contents for 12V 4000 G 41
Page 22: ...II Table of Contents M015403 00E 02 09 MTU w w w g e n e r e n t r u...
Page 30: ...II Table of Contents M015403 00E 02 09 MTU w w w g e n e r e n t r u...
Page 38: ...8 Maintenance Schedule Application Group 3A M015403 00E 02 09 MTU w w w g e n e r e n t r u...
Page 40: ...II Table of Contents M015403 00E 02 09 MTU w w w g e n e r e n t r u...
Page 116: ...58 Engine Governor Electronic Control System M015403 00E 02 09 MTU w w w g e n e r e n t r u...
Page 118: ...II Table of Contents M015403 00E 02 09 MTU w w w g e n e r e n t r u...
Page 124: ...w w w g e n e r e n t r u...