GEDA
®
MINI 60 S / MAXI 120 S / MAXI 150 S
Technical description
BL068 GB Edition 03/2015
29 / 90
Assembly and Operating Manual
3.3.7
Small on-site main cabinet
Construction lifts must be operated via a building site mains distributor.
(Refer to national provisions)
Assembly
Drive the earthing rod (5) into the
ground.
Route the
PE
conductor (4) of the
small on-site main cabinet to the
earthing rod (5) and connect it
there.
Connect the mains line (1) of the
small on-site main cabinet to the
mains supply on the construction
site.
Item No. 02823
Weight: 8 kg [18 lb]
Test the trigger ability of the Residual Current Device (RCD) by
pressing the test button (2).
Connect the mains plug of the scaffolding lift (3) at the small on-site
main cabinet.