Critical Power
Modifications reserved
Page 67/146
GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx
User Manual
TLE Series 600 & 800 CE S1
Fig. 5.10.3-4 TLE Series 600 - Control Bus cable routing and connection
Fig. 5.10.3-5 TLE Series 800 - Control Bus cable routing and connection
Control bus cables routing
Place and fix the cables
J1A
–
J2A
(1/2/3/4/5)
and
J1B
–
J2B
(1/2/3/4/5)
inside the UPS cabinets in
the position illustrated in the drawing
Fig. 5.10.3-4
and
5.10.3-5
.
NOTE !
Pay attention when cabling and routing the communication bus cables
J1A
–
J2A
(1/2/3/4/5)
and
J1B
–
J2B (1/2/3/4/5)
inside the UPS cabinet.
In case one unit must be removed from the
Parallel System
, the communication
bus cables must be taken out the UPS cabinet WITHOUT DISCONNECTING THEM
from the two boards
“
P13/P14
–
IM0222
–
Bus Interface Board
”
.
For reliability reasons the cables
J1A
–
J2A (1/2/3/4/5)
and
J1B
–
J2B (1/2/3/4/5)
connecting the units
should be run in separated protected conduits (as indicated in
Fig. 5.10.3-4
and
5.10.3-5
) separated
from the power cables.
It is important that the cable
J1A
–
J2A (1/2/3/4/5)
must be the same length as cable
J1B
–
J2B
(1/2/3/4/5)
.
WARNING !
Connection and commissioning of an additional UPS to an existing
Parallel System
must be performed by a service engineer from of your
Service Centre
.
TLES_600_
S1_RPA co
nnection_
03GB
- +
1
2
Q1
0 OFF
I O
N
J2
J1
J2
J1
B
A
J1A/1
J1B/1
UPS 1
- +
1
2
Q1
0 OFF
I O
N
UPS 2
UPS 1
J2
J1
J2
J1
B
A
J1A/1
J1B/2÷5
J1B/1
J1A/2÷5
UPS 2/3/4/5
UPS 3, 4, 5, 6
J1B/2÷5
J1A/2÷5
TLES_800_
S1_RPA co
nnection_
03GB
J2
J1
J2
J1
B
A
J1A/1
J1B/1
UPS 1
UPS 1
J2
J1
J2
J1
B
A
J1A/1
J1B/2÷5
J1B/1
J1A/2÷5
UPS 2/3/4/5
UPS 3, 4, 5, 6
J1B/2÷5
J1A/2÷5
- +
1
2
Q1
0 OFF
I O
N
- +
1
2
Q1
0 OFF
I O
N
UPS 2