Critical Power
Modifications reserved
Page 115/146
GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx
User Manual
TLE Series 600 & 800 CE S1
2.
Close “Q1
-
UPS Output switch”
(Pos. I)
.
Rectifier
starts automatically.
LED 1 (Rectifier)
blinking, indicates
Soft-start
.
At the end of
Rectifier Soft-start
the
LED 1 (Rectifier)
remains lit.
NOTE !
Ensure the
LED 1 (Rectifier)
is lit before carrying out this procedure.
It indicates that the DC-Link has reached 800Vdc (see screen
MEASURES / Rectifier)
!
Attention: check the right DC polarities on both side of the switch/fuse holder!
3.
Connect the Battery to the UPS by closing the “
External
Battery Protections”.
NOTE !
Before performing the next procedure make sure that the LED 3
(Booster/Battery charger)
is lit.
4. Insert the inverter performing the command
“
Inverter ON"
.
Perform the
“Inverter ON”
command from the screen:
Commands 1 / Inverter /
ON
.
Soft-start
of
Inverter
indicated with blinking
LED 2 (Inverter)
.
At the end of
Soft-start
the
LED 2 (Inverter)
remains lit.
Load
is now supplied from
Inverter
.
LED ALARM
turns Off and the
LED LOAD PROTECTED
must be lit.
The
Synoptic Diagram
must display the status
“
LOAD
SUPPLIED BY INVERTER
”
.
END OF PROCEDURE
NOTE !
The
Battery
must be charged for at least 10 hours, in order to ensure the full backup
runtime in case of a
Mains Failure
.