GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Page 116
Section 4.0 - Install Options
4.7
Customer Accessories - Head Holders and Extender
Open the boxes and installed the appropriate language warning labels.
The head holders are shipped with shims that require installation to ensure proper fit. Check that
shims are included. Follow the shim procedure in Chapter 3, Section 3. The holder should fit snugly.
4.8
UPS Installation
If the site has an Uninterruptible Power Supply (UPS), please refer to UPS Installation for Direction
5174051-100 for Powerware 9155 UPS
. This manual should be shipped with the UPS. Use caution
when removing the UPS from the skid. The UPS weight is 170kg (375lb).
4.9
Flat Tabletop used with Respiratory Gating
Follow the installation instructions with the Option.
4.10
SmartStep Installation
Follow the instruction shipped with option.
For the installation of the additional Gantry hardware (e.g. Gantry accessory panels and cables),
refer to Accessory I/F Hardware option installation manual (5317058-1EN).
Summary of Contents for Optima CT670
Page 205: ...CT ...
Page 206: ...206 www gehealthcare com ...