Chapter 1 - Position Subsystems
Page 63
sys
tems
Section 10.0 Table Installation (Lite Table)
10.1
Time and Personnel
10.2
Tools and Test Equipment
•
Standard Install Tool Kit
•
3/4", 1-1/4", 1-1/2" and 1-5/8" sockets
•
8mm, 10mm, and 14mm hex socket bits
•
Laser Alignment kit
•
Johnson Professional 6" level
•
Johnson Professional 4’ level
•
Johnson Professional 2’ level
10.3
Procedures
10.3.1
Draw Table Reference Lines
1.) Draw a reference line of 564mm position from Gantry Base on the floor as shown in the
.
Figure 1-38 Draw Reference Line
Required Persons
Preliminary Reqs
Procedure
Finalization
2 (FE or mechanical supplier)
1.5 hours labor on-site
564 mm
Draw this line on the floor.
Table Base
Gantry Base