
GE H
EALTHCARE
D
IRECTION
5305880-100, R
EVISION
3
LOGIQ™ 100 PRO S
ERVICE
M
ANUAL
Page 3-14
Section 3-5 - Completing the Installation
Installation of LOGIQ™ 100 PRO with Global or Modular Trolley (Contd.,)
3.)
Remove two M4X10 screws from the base ofLOGIQ™ 100 PRO and fix lock plate. Refer
Figure 3-11
4.)
Place the unit with lock plate fixed on Trolley, ensure that lock plate gets into the projection on
the trolley. Refer Figure 3-11
Figure 3-11 Installation of Trolley
Lock Plate
Detail X
Lock Plate
Console
Detail X
Trolley
Additional Details
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5305880-100TPH_r3.pdf Page 59 of 197