
GE H
EALTHCARE
D
IRECTION
5305880-100, R
EVISION
3
LOGIQ™ 100 PRO S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
Page 8-21
Section 8-7 Power Supply/Distributor PCB
8-7-1
Disassembly/Assembly of Power Supply/Distributor PCB
Follow steps below and refer 8-13
1.)
Remove Top Cover. Refer 8-2. For FRU Details refer
2.)
Remove Front Panel. Refer 8-4-1
3.)
Remove dust filter (m).
4.)
Remove two screws (e,f) holding the power supply unit to the chassis.
5.)
Remove four screws (c,d,g,h) to remove cross member.
6.)
Remove the fan. Refer 8-6-1.
7.)
Remove all connections on the Power Supply Distributor.
8.)
Remove screws (a,b) holding the Power Supply to the chassis.
9.)
Remove two screws (i,k) and loose the other two screws (j,l) and remove the dust filter plate.
10.) Slide the power supply forward (CRT may have to be lifted up to remove the power supply)
11.) Remove six screws holding the Power Supply Distributor PCB to the power supply rear
bracket. (not shown in figure)
12.) Remove the Power Distributor PCB upward after disconnecting the cable connector between
power supply and power distributor pcb.
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5305880-100TPH_r3.pdf Page 150 of 197