
GE H
EALTHCARE
D
IRECTION
5305880-100, R
EVISION
3
LOGIQ™ 100 PRO S
ERVICE
M
ANUAL
Page 8-6
Section 8-3 - KEYBOARD
8-3-2
Keyboard Disassembly/Assembly
Follow steps below and refer Figure 8-3 . For FRU Details refer 9-1-4
1.)
Remove Top Cover. Refer 8-2.
2.)
Detach the keyboard. Refer 8-3-1.
3.)
Remove the spacer pad (refer FRU NO. 308 in the 8-7) which is near the lock release.
4.)
Remove four screws a,b,c,d (b, is not visible in diagram).
5.)
Remove keyboard top with PCB assembly.
6.)
Remove the eight fixing screws (e to l) on the base plate.
7.)
Remove the Gain knob (use allen key for M2.6 grub screw)
8.)
Remove trackball mounting by removing two screws (man) and take out the trackball.
9.)
Remove the TGC connector from the Davinci Board (for LOGIQ™ 100 PRO).
10.) Remove Gain Encoder connector.
11.) Remove the two screws (o,p) holding the Gain Encoder Unit.
12.) Remove eleven screws (q x 11 Nos.) holding the keyboard PCB to the base plate to separate
the keyboard PCB.
13.) For assembly follow the reverse order.
Note:
When assembling the PCB to the base plate, M3x6 screws
only
should be used because a wrong screw
used will pierce the key sheet.
Service Manual
Section
Functional Test/ Diagnostic Test
Debrief Script
4-2-1
Power ON/ Boot up
Service manual direction 5305880-
100, Section 8-3-2.Equipment
passed all required tests and is
ready for use.
4-2-1
Power OFF/ Shut down
4-3
Functional Checks
7-2-3
Key board Diagnostics tests
Table 8-4 Functional tests
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5305880-100TPH_r3.pdf Page 135 of 197