
GE H
EALTHCARE
D
IRECTION
5305880-100, R
EVISION
3
LOGIQ™ 100 PRO S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
Page 8-23
5.)
Remove the connections to the circuit breaker.
6.)
Remove the rear panel from the chassis.
7.)
For assembly follow the reverse order.
Table 8-11 Functional tests
Service Manual
Section
Functional Test/ Diagnostic Test
Debrief Script
4-2-1
Power ON/ Boot up
Service manual direction 5305880-
100, Section 8-8-1.Equipment passed
all required tests and is ready for use.
4-2-1
Power OFF/ Shut down
4-3
Functional Checks
4-6
Peripheral checks
Figure 8-14 Disassembly/Assembly of Rear Panel
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5305880-100TPH_r3.pdf Page 152 of 197