Instruction Manual
xvi
Rev. 6, March 2011
Part 17997
7.2 Verification of Operation Prior to Installation . . . . . . . . . . . . . . 7-2
Preparation . . . . . . . . . . . . . . . . . . . . . . . . 7-2
Initial Observations . . . . . . . . . . . . . . . . . . . . . 7-3
Verification of RS-232 and RS-485 Communications . . . . . . . . 7-4
Completing the Verification . . . . . . . . . . . . . . . . . . 7-6
7.3 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6
Verifying the ac Power Supply Voltage and the Serial Numbers. . . . 7-7
Installing the Enclosure . . . . . . . . . . . . . . . . . . . 7-7
Installing the Cable Conduits . . . . . . . . . . . . . . . . . 7-7
Installing the Supervisory Link Cables. . . . . . . . . . . . . . 7-8
Installing the ac Power Supply Cable . . . . . . . . . . . . . . 7-9
Verifying the Operation . . . . . . . . . . . . . . . . . . . 7-9
Verifying the Supervisory Link Communications . . . . . . . . . 7-9
Conclusion . . . . . . . . . . . . . . . . . . . . . . . . 7-10
7.4 Other Installations . . . . . . . . . . . . . . . . . . . . . . . . 7-10
8.1 Incoming Inspection and Verification . . . . . . . . . . . . . . . . . 8-1
Receiving and Unpacking . . . . . . . . . . . . . . . . . . . 8-1
Inspecting . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
Storage . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2
8.2 Verification of Operation Prior to Installation . . . . . . . . . . . . . . 8-2
Preparation . . . . . . . . . . . . . . . . . . . . . . . . 8-3
Initial Observations . . . . . . . . . . . . . . . . . . . . . 8-3
Verifying the Analog Output . . . . . . . . . . . . . . . . . 8-4
Verifying the Alarm Indicators and Relays . . . . . . . . . . . . 8-6
8.2.4.1
Gas High Alarm . . . . . . . . . . . . . . . . . . 8-6
Gas High-High Alarm . . . . . . . . . . . . . . . . 8-7
System Fault Alarm . . . . . . . . . . . . . . . . . 8-7
System Fault Alarm Cleared . . . . . . . . . . . . . . 8-8
Gas Alarms Cleared . . . . . . . . . . . . . . . . . 8-8
Conclusion . . . . . . . . . . . . . . . . . . . . 8-9
Verifying the RS-232 Communication . . . . . . . . . . . . . . 8-9
Conclusion . . . . . . . . . . . . . . . . . . . . . . . . 8-10
8.3 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11
Verifying the ac Power Supply Voltage and the Serial Numbers. . . . 8-11
Installing the Enclosure . . . . . . . . . . . . . . . . . . . 8-11
Installing the Cable Conduits . . . . . . . . . . . . . . . . . 8-12
Installing the Supervisory Link Cable . . . . . . . . . . . . . . 8-12
Installing the Analog Output Cable (Facultative). . . . . . . . . . 8-13
Summary of Contents for Hydran 201i
Page 1: ...GE Energy Services Digital Energy Hydran Instruction Manual 201i System ...
Page 6: ...Instruction Manual vi Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 8: ...Instruction Manual viii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 22: ...Instruction Manual xxii Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 36: ...Chapter 1 Introduction 1 10 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 114: ...Chapter 5 Before Installation 5 16 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 143: ...Installation Part 17997 Rev 6 March 2011 6 29 Figure 6 9 Installing the CPU Module ...
Page 236: ...Chapter 12 Troubleshooting 12 20 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 244: ...Chapter 13 Maintenance 13 8 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 254: ...Appendix B Mechanical Drawings B 2 Rev 6 March 2011 Part 17997 Figure B 3 1 5 In Adaptor ...
Page 255: ...Hydran 201Ti Intelligent Transmitter Part 17997 Rev 6 March 2011 B 3 Figure B 4 1 In Adaptor ...
Page 284: ...Appendix G Unit Conversions G 2 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 298: ...Appendix I Glossary I 12 Rev 6 March 2011 Part 17997 PAGE LEFT INTENTIONALLY BLANK ...
Page 299: ......