Chapter 8 - Replacement Procedures
8-135
D
IRECTION
5771498-100, R
EVISION
6
V
ENUE
™ S
ERVICE
M
ANUAL
P R E L I M I N A R Y
c.) Release the ground cable using an appropriate Phillips screwdriver.
5.) The cable is released.
8-7-4-5
PSU to MPB DC Docking Cable Installation Procedure
1.) Connect the J8 and lower PSU connectors:
•
From the front end, position the cable connectors in the J8 and lower PSU connectors, ensuring
the orientation is appropriate, by checking the plastic marks are pointing to the correct direction.
•
Push the connectors' plastic hinges through the designated holes, until both hinges are fully
inside.
•
Connect the ground cable using an appropriate Phillips screwdriver.
2.) Perform Fan installation procedure.
3.) perform MPB installation procedure.
4.) Turn ON power to the system
Figure 8-137 Releasing the Ground Cable
Figure 8-138 Released Cable
•
MPB Fan Installation Procedure
•
MPB Module Installation Procedure
Summary of Contents for H45051VN
Page 477: ......