8-70
Section 8-5 - Electronic Boards- Replacement Procedures
D
IRECTION
5771498-100, R
EVISION
6
V
ENUE
™ S
ERVICE
M
ANUAL
P R E L I M I N A R Y
8-5-2-5
T-CFE Release Arm Installation Procedure
1) Install a new T-CFE Release Lever in position on the PSB board.
2) Refit the T-CFE Board.
3.) Insert and tighten the 6 T-CFE Board retaining screw shown in
4.) Install the T-FEPS module:
5) Install the Front End door assembly:
6.) Refit the following covers: Lower Front eTower, Left side eTower, and Right Side eTower.:
:
7.) Install all accessories.
8.) Turn ON power to the system.
Figure 8-57 Removing CFE Release Arm
•
Front End Power Supply Removal Procedure
•
Front End Metal Door Replacement
•
Right Side eTower Cover Installation Procedure
•
Left Side eTower Cover Installation Procedure
•
Lower Front eTower Cover Installation Procedure
•
RS Probe Cover Removal Procedure
•
Accessories - Replacement Procedures
Summary of Contents for H45051VN
Page 477: ......