GE Grid Solutions
D25
User's Manual
GE Information
994-0081-3.00-21
83
Using WESMAINT
On-Line Start-
up Test
When the D25 is powered-up or restarted, internal processes perform a series
of routines, starting with self-tests, followed by the spawning of all the
software applications that reside in the unit’s memory.
Many of these processes will output progress messages to the 68K monitor, as
they are performed. Having a terminal set up to view these start-up messages
can provide useful information about the operational status of the unit.
Note
Terminal emulation software is not part of the D25 system, but terminal
software, such as SGConfig’s Terminal Emulator, can be used for viewing
system messages.
For complete instructions about using the emulation software in your stand-
alone PC or laptop, refer to the documentation provided with the software.
Procedure:
Setup Terminal
for
WESMAINT
Steps to setup a PC to act as a WESMAINT II+ terminal.
Step
Action
1
Open the VT100 compatible terminal emulation software you are
going to use.
2
Verify (or set) terminal communications settings as follows:
•
Data Rate
•
Data Bits
•
Stop Bits
•
Parity
•
Flow Control
•
Connector settings
9600 bps
8
1
None
Xon/Xoff (software)
(COM1, COM2) as required by the
computer being used
Results: Your terminal emulator settings are now configured.
Summary of Contents for D25
Page 170: ......