Modifications reserved
Page 98/99
OPM_SPE_XXX_10K_40K_8GB_V020.doc
Operating Manual
SitePro 10-15-20-30-40 kVA / S8
12 NOTES
12.1 NOTES FORM
It is recommended to note in this section
Notes
, with date and short description all the operations
performed on the UPS, as: maintenance, components replacement, abnormal situations, etc.
Date
Description
Done by