Modifications reserved
Page 93/99
OPM_SPE_XXX_10K_40K_8GB_V020.doc
Operating Manual
SitePro 10-15-20-30-40 kVA / S8
10.5 CONNECTION FOR OPTIONS
WARNING !
The installation and cabling of the options must be performed by QUALIFIED
SERVICE PERSONNEL only.
MAKE SURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.
Refer to the “
Safety prescriptions - Installation
” described on
Section 1
.
10.5.1 Auxiliary Power Supply (APS) 24 Vdc for
SitePro 10 - 15 – 20 kVA
PA
= Auxiliary Power Supply 24 Vdc
XA
= Terminals for connection 230 VAC
XB
= Terminals for connection 24 Vdc
L1 N
PA
O
P
T_APS_S
P
010-
020
S7_
01
L
N
XB
NC
- -
+
+
PA
_
+
XB1 XB2
F50
M4x10
P29 - IM0062 Interface Suppressor
XA
F50
XA
Fig. 10.5.1-1 Auxiliary Power Supply 24 Vdc for SitePro 10 – 15 – 20 kVA
Connection
From
To
Cable
PA+ (black)
PA - APS:
PA+
Terminal:
XB1 (+)
Cable
PA- (grey)
PA - APS:
PA-
Terminal:
XB2 (-)
Cable
PA-L (black)
PA - APS:
L
Terminal:
XA-L1
Cable
PA-N (grey)
PA - APS:
N
Terminal:
XA-N
Cable
PA-PE (yellow-green)
PA - APS:
PE
UPS
frame:
PE
(see
Fig. 10.5.1-1
)
NOTE !
Clamp the cables with the cable-ties.