Operating Manual
SitePro 10-15-20-30-40 kVA / S8
2. Check for correct phase rotation of input mains on ”P1 - Power Interface”.
•
Lamp B1 ON:
the phase rotation (clockwise)
is correct
(see
Fig. 5.8.2-1
).
•
Lamp B1 OFF:
the phase rotation (anti-clockwise)
is not correct
(see
Fig. 5.8.2-1
).
In this case switch OFF the mains, reverse two phases between them on the line
supplying the UPS and repeat the procedure from point 1.
3. Close the input rectifier switch Q4 (Pos. I).
LED 1 (input mains rectifier)
must be lit and
LED 3 (rectifier)
must blink.
The rectifier starts up automatically, supplying the DC circuit, and charging the DC capacitors.
The
LED 3 (rectifier)
stops blinking and stays ON, indicating that the DC link has reached the floating voltage.
4. Battery coupling to DC link.
After awhile, the
green LED LD1
next to the battery fuse carrier,
F8 – F9
lights up, indicating the rectifier
supplies the floating voltage.
After checking the right polarity, connect the battery to the DC-link by closing
F8 – F9
.
The
battery
is now connected to the DC link.
LED 4b
(charging battery)
should be lit indicating
battery charge
.
5. Close the output switch Q1 (Pos. I).
The
load
is supplied by the mains through the
automatic
bypass
.
The
synoptic diagram
must display the status
“
LOAD
SUPPLIED BY AUTOMATIC BYPASS
”
.
6. Insert the inverter by pressing
“
Inverter ON
”
( I ) key.
The
inverter
will start up.
LED Inverter (5)
must be blinking.
In a short time, when the
inverter voltage
is confirmed, the
LED Inverter (5)
will stop blinking and stay fixed
lit.
The
load
will be automatically transferred from
mains
to
inverter
.
LED Alarm
turn Off and the
LED Operation
must be lit.
The
synoptic diagram
must display the status
“
LOAD
SUPPLIED BY INVERTER
”
.
7. Load
supply.
Your
SitePro
UPS is now running in
VFI mode
, supplying power to the output.
Insert the
loads
one by one to the output of the UPS.
Check the output current value of
L1
,
L2
and
L3
and check for correct load balance.
8. Operation mode selection.
SitePro
is delivered normally selected for permanent
VFI
operation.
SEM
mode can be enabled and the
SEM START
time &
SEM STOP
time can be programmed for each day of
the week (see
Section 7.4 SETUP / SUPER ECO MODE)
.
NOTE !
The
Battery
must be charged for at least 10 hours, in order to ensure the full backup
runtime in case of a
Mains Failure
.