JF-240UV User Manual
163
Step 4 Open the cover of pressure gauge.
Step 5 Press
and
buttons at the same and hold for 2 seconds. Release after “0Ad” is shown on
the display and adjust the pressure gauge with
and
buttons.
Note: the default setting for pressure gauge is between 3~4 kpa according to local environment.
Adjust the pressure gauge to optimized value base on the weather condition to prevent ink from
dripping.
Step 6 Put back the plug of air buffer tube.
Step 7 Install back the gauge cover and right side cover.
Step 8 Open the ink tube clip and complete the procedure.
Summary of Contents for JF-240UV
Page 1: ...JF 240UV User Manual http www GCCworld com V 9 2020 Sep GCC GCC Club...
Page 21: ...JF 240UV User Manual 20 3 Select Activate Now...
Page 24: ...JF 240UV User Manual 23 Control panel flow...
Page 25: ...JF 240UV User Manual 24 Operating work flow...
Page 27: ...JF 240UV User Manual 26 Operating work flow...
Page 28: ...JF 240UV User Manual 27 Control panel flow O N FRONT REAR O N O N OFF OFF...
Page 42: ...JF 240UV User Manual 41 B Set the PH Gap Auto Adjustment to be OFF on the control panel...
Page 57: ...JF 240UV User Manual 56 Step 4 The settings is completed and open FlexiPRINT GCC Edition...
Page 87: ...JF 240UV User Manual 86 8 Select Advanced...
Page 102: ...JF 240UV User Manual 101 4 Select Rip and print 5 Set the send mode is Hold list and send it...
Page 130: ...JF 240UV User Manual 129 5 4 2 Introduction of VLCD VLCD Description...
Page 168: ...JF 240UV User Manual 167 Step 2 Enter the password caldera Step 3 Click Next...
Page 169: ...JF 240UV User Manual 168...