CFN Series System
7-2
03/07/03
g.
Turn off all hoses.
h.
Place the system override switch, for Hose 1 in the
ON
position.
i.
Repeat Steps d through h for all remaining hoses. Substitute the hose number being
tested for hose 1 until all hoses have been tested.
j.
Replace all connectors and reassemble.
Summary of Contents for CFN Series
Page 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Page 2: ......
Page 8: ...CFN Series System Contents 4 03 07 03 ...
Page 24: ...CFN Series System 2 12 03 07 03 ...
Page 25: ...Site Information 03 07 03 2 13 ...
Page 26: ...CFN Series System 2 14 03 07 03 ...
Page 38: ...CFN Series System 4 6 03 07 03 ...
Page 56: ......
Page 58: ......
Page 72: ......
Page 82: ...CFN Series System 9 10 03 07 03 ...
Page 104: ...CFN Series System 12 12 03 07 03 ...
Page 108: ...CFN Series System 13 4 03 07 03 ...