3
6.
SYSTEM ENVIRONMENT
Site Controller/Islander: ________________________________________________________________________
Console: ___________________________________________________________________________________
PCU(s): ____________________________________________________________________________________
ICR(s): _____________________________________________________________________________________
Profit Point(s): _______________________________________________________________________________
FPR's: _____________________________________________________________________________________
7.
CONDUIT
All Metal Conduit? Y / N
AC and DC in Separate Conduit? Y / N
Wiring Neatness: Good/Fair/Bad
Is shielded cable (as specified in the Installation Manual) used? Y / N
If you answered
NO
to the above questions, contact GASBOY before proceeding.
8.
SYSTEM POWER
Power Conditioner:
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
AC Surge Protector:
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
Islander:
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
PCU'(s):
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
ICR'(s):
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
FPR'(s):
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
Grounding method:
9.
DC POWER
Site Controller/Islander: +5 VDC _______ +12 VDC _______ -12 VDC _______
PCU'(s): +5 VDC _______ +12 VDC _______
ICR'(s): +5 VDC _______ +12 VDC _______
Current Loop Interface: +5 VDC _______ + 12VDC _______ -12 VDC _______
Consoles: +5 VDC _______ + 12VDC _______ -12 VDC _______ +9 VDC _______
FPR'(s): +5 VDC _______
10. SYSTEM APPROVALS
Customer Comments: __________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
Site Manager: _________________________ Date: _______
I am satisfied with the installation of the GASBOY
CFN System and have been trained in its use and
operation.
Start-up Tech: _________________________ Date: _______
11. CUSTOMER KNOWLEDGE
___________________________________________________
Time Spent on Training:
Names of People Trained:
Were test cards locked out? Y / N
Who were test cards left with?
Was backup copy made of system and any configuration changes? Y / N
Remarks:
(Use additional sheets if necessary)
____________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
Summary of Contents for CFN Series
Page 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Page 2: ......
Page 8: ...CFN Series System Contents 4 03 07 03 ...
Page 24: ...CFN Series System 2 12 03 07 03 ...
Page 25: ...Site Information 03 07 03 2 13 ...
Page 26: ...CFN Series System 2 14 03 07 03 ...
Page 38: ...CFN Series System 4 6 03 07 03 ...
Page 56: ......
Page 58: ......
Page 72: ......
Page 82: ...CFN Series System 9 10 03 07 03 ...
Page 104: ...CFN Series System 12 12 03 07 03 ...
Page 108: ...CFN Series System 13 4 03 07 03 ...