Jumpers & Switch Settings
03/07/03
5-9
3.
Pulse Connection: Verify that the
K1
through
K4
jumpers (pulse type jumpers) match the
type pulser being used for each pump position. Use the table below to determine your
settings.
WARNING
K1
to
K4
jumpers
must
be set in the configurations shown before turning on power to the
PCU or damage to the system components may occur.
4.
Debounce Configuration: Verify that the
K5
jumper (debounce) is set properly.
The K5 jumper should remain jumpered
for all Reed switch quantity pulsers and
unjumpered for all electronic and money
pulsers.
5.
Replace the cover plate on the pump control I/O board and re-install the board into the card
cage.
6.
Replace the five green connectors into the proper sockets on the front of the Pump Control
I/O board.
7.
Repeat all steps for both the EXPMUX Pump Control CPU and Pump Control I/O PCBs for
each pump control unit.
Summary of Contents for CFN Series
Page 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Page 2: ......
Page 8: ...CFN Series System Contents 4 03 07 03 ...
Page 24: ...CFN Series System 2 12 03 07 03 ...
Page 25: ...Site Information 03 07 03 2 13 ...
Page 26: ...CFN Series System 2 14 03 07 03 ...
Page 38: ...CFN Series System 4 6 03 07 03 ...
Page 56: ......
Page 58: ......
Page 72: ......
Page 82: ...CFN Series System 9 10 03 07 03 ...
Page 104: ...CFN Series System 12 12 03 07 03 ...
Page 108: ...CFN Series System 13 4 03 07 03 ...