Jumpers & Switch Settings
03/07/03
5-17
A C07263 cable is also needed on the Site Communication I/O board from P10 connector to
pins 6 through 10 of P3 (for port1) or P4 (for port 3). This cable is installed in the head of the
Islander at the factory.
Cabling and Port Jumper Configuration for Wayne Pumps
The SC II CPU K1 (port1) or K2 (port 3) jumper patch must be configured as
follows to communicate with the Wayne pumps.
The jumpers on the Site Communication I/O board in the head of the Islander (on the inside of the
left partition) for port 1 or port 3 must be configured as shown below:
Summary of Contents for CFN Series
Page 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Page 2: ......
Page 8: ...CFN Series System Contents 4 03 07 03 ...
Page 24: ...CFN Series System 2 12 03 07 03 ...
Page 25: ...Site Information 03 07 03 2 13 ...
Page 26: ...CFN Series System 2 14 03 07 03 ...
Page 38: ...CFN Series System 4 6 03 07 03 ...
Page 56: ......
Page 58: ......
Page 72: ......
Page 82: ...CFN Series System 9 10 03 07 03 ...
Page 104: ...CFN Series System 12 12 03 07 03 ...
Page 108: ...CFN Series System 13 4 03 07 03 ...