3
6.
SYSTEM ENVIRONMENT
Site Controller/Islander:
inside office, air-conditioned
_______________________________________________
Console:
inside office, air-conditioned
___________________________________________________________
PCU(s):
back room off of office
________________________________________________________________
ICR(s):
on island
_____________________________________________________________________________
Profit Point(s):
N/A
____________________________________________________________________________
FPR's:
N/A
__________________________________________________________________________________
7.
CONDUIT
All Metal Conduit?
Y
/ N
AC and DC in Separate Conduit?
Y
/ N
Wiring Neatness:
Good
/Fair/Bad
Is shielded cable (as specified in the Installation Manual) used?
Y
/ N
If you answered
NO
to the above questions, contact GASBOY before proceeding.
8.
SYSTEM POWER
Power Conditioner:
Hot to Neutral __
120
_ VAC Hot to Ground _
120
VAC Neutral to Ground __
0
__ VAC
AC Surge Protector:
Hot to Neutral __
N/A
_
VAC Hot to Ground _
N/A
VAC Neutral to Ground _
N/A
VAC
Islander:
Hot to Neutral __
N/A
_
_ VAC Hot to Ground _
N/A
VAC Neutral to Ground __
N/A
VAC
PCU'(s):
Hot to Neutral __
120
_ VAC Hot to Ground _
120
VAC Neutral to Ground __
0
__ VAC
ICR'(s):
Hot to Neutral __
120
_ VAC Hot to Ground _
120
VAC Neutral to Ground __
0
__ VAC
FPR'(s):
Hot to Neutral __
N/A
_
_ VAC Hot to Ground __-__ VAC Neutral to Ground ___-__ VAC
Grounding method:
neutral and ground bus bars bonded to ground rod
9.
DC POWER
Site Controller/Islander: +5 VDC __
5.01
__ +12 VDC __
11.99
__ -12 VDC _
-11.95
__
PCU'(s): +5 VDC _
5.00
__ +12 VDC _
11.98
____
ICR'(s): +5 VDC __
5.01
__ +12 VDC _
11.99
____
Current Loop Interface: +5 VDC _______ + 12VDC _______ -12 VDC _______
Consoles: +5 VDC __
5.00
___ + 12VDC _
12.05
___ -12 VDC _
12.00
___ +9 VDC _
9.00
_____
FPR'(s): +5 VDC _______
10. SYSTEM APPROVALS
Customer Comments: __________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
Site Manager: _
Dave Christopher
____ Date:
9-5-98
I am satisfied with the installation of the GASBOY
CFN System and have been trained in its use and
operation.
Start-up Tech: __
Arthur Ized Repp
_ Date:
9-5-98
11. CUSTOMER KNOWLEDGE
has good understanding
__________________________________
Time Spent on Training:
4 hours
Names of People Trained:
Dave Christopher, Christine Tabby
Were test cards locked out?
Y
/ N
Who were test cards left with?
Dave Christopher
Was backup copy made of system and any configuration changes?
Y
/ N
Remarks:
(Use additional sheets if necessary)
____________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
Summary of Contents for CFN Series
Page 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Page 2: ......
Page 8: ...CFN Series System Contents 4 03 07 03 ...
Page 24: ...CFN Series System 2 12 03 07 03 ...
Page 25: ...Site Information 03 07 03 2 13 ...
Page 26: ...CFN Series System 2 14 03 07 03 ...
Page 38: ...CFN Series System 4 6 03 07 03 ...
Page 56: ......
Page 58: ......
Page 72: ......
Page 82: ...CFN Series System 9 10 03 07 03 ...
Page 104: ...CFN Series System 12 12 03 07 03 ...
Page 108: ...CFN Series System 13 4 03 07 03 ...