03/07/03
9-1
Section 9
DC POWER MEASUREMENT AND ADJUSTMENT
The following steps describe, for each of the components, how to measure the voltages required
in Section
9. DC POWER
of the Start-up form. If any of the measured DC voltages are outside of
the tolerances noted (except for +5 which can be adjusted), immediately shut off the
AC POWER
switch of the unit and diagnose the problem. Test points are shown for each of the system
devices in this section. All voltage measurements should be taken with the negative lead of the
digital voltmeter on the ground (
GND
) test point.
✍
9. DC POWER
As you are measuring the noted voltages, fill in the readings for each in this section of the Start-up
Form.
Summary of Contents for CFN Series
Page 1: ...CFN SERIES SITE CONTROLLER II ISLANDER II START UP MANUAL C01665 GASBOY INTERNATIONAL LLC ...
Page 2: ......
Page 8: ...CFN Series System Contents 4 03 07 03 ...
Page 24: ...CFN Series System 2 12 03 07 03 ...
Page 25: ...Site Information 03 07 03 2 13 ...
Page 26: ...CFN Series System 2 14 03 07 03 ...
Page 38: ...CFN Series System 4 6 03 07 03 ...
Page 56: ......
Page 58: ......
Page 72: ......
Page 82: ...CFN Series System 9 10 03 07 03 ...
Page 104: ...CFN Series System 12 12 03 07 03 ...
Page 108: ...CFN Series System 13 4 03 07 03 ...