PULSE Installation, Commissioning and Servicing Manual - Revision 19
1
1
locking
locking
pin
pin
holes
holes
2
2
3
3
5
5
7
MAINTAINING THE SPRING REEL TENSION (L SERIES)
The following describes the procedure for tensioning the spring reel with the use of a
locking pin which is inserted through holes drilled in each side of the spring reel
(1)
Attach the rope to the wire loop on the spring reel and wrap rope
around the reel the required number of times
(2)
16mm hose
: 2.0 turns
VR hose
:
2.5 turns
25mm hose
: 3.0 turns
WARNING:
Extreme care must be taken to avoid
accidental injury should the spring reel be allowed to recoil
unexpectedly. Gloves and eye protection
MUST
be worn.
Pull the rope down to tension the spring reel
(3)
and keep pulling down until the wire loop is level
with the retractor carriage
(4)
While still pulling down on the rope, insert the retractor locking pin through the holes in the reel,
locking the spring reel against both sides of the bracket, thereby preventing the rotation of the
spring reel.
When locked the wire loop should be approx. 20-30mm above the hose carriage
(5)
Remove the rope from the wire and attach the wire loop to the top of the carriage
(6)
While keeping tension on the carriage with the left hand, use the right hand to slide out the retractor
locking pin
(7)
Slowly allow the carriage to slide upwards to the top of the rail
(8)
8
8
7
7
4
4
tension
tension
6
6
.