2. WIRING
2-10
2.2.3
Processor unit cable (LAN cable)
Connect the processor unit with LAN cable (MOD-Z072-050+, 5m). When using the
optional armored cable, peal the external sheath and armor from the cabling. Refer to
the following page for armored cable fabrication.
Note:
Do not connect equipment other than the FCV-2102 or HUB-101 to the NET-
WORK port.
1. Open the cover of the transceiver unit.
2. Unfasten the seal nut of NETWORK port and disassemble the seal assembly.
3. Dismantle the seal assembly as shown below.
4. Pass the cable into the seal nut and seal assembly, then insert the cable into the
unit through the cable gland.
5. Set the gasket assembly onto the LAN cable.
6. Pack the gasket assembly into the seal nut.
Seal assembly
Seal assembly
Seal
Seal
Claw
Claw
Seal nut
Seal nut
Dismantling the seal assembly
STEP1:
Hold the fat end of the assembly
with both thambs while placing the
index fingernails between the seal
and claw.
Use caution to avoid injury.
STEP 2:
Using the thumbs, gently push
the seal out of the claw.
Summary of Contents for FCV-2100
Page 6: ...EQUIPMENT LISTS iv This page is intentionally left blank...
Page 14: ...1 MOUNTING 1 8 This page is intentionally left blank...
Page 46: ...3 INITIAL SETTINGS 3 18 This page is intentionally left blank...
Page 52: ...16 Nov 2015 H MAKI 16 Nov 2015 H MAKI...
Page 53: ...17 Nov 2015 H MAKI 17 Nov 2015 H MAKI...
Page 54: ...26 Feb 2016 H MAKI 26 Feb 2016 H MAKI...
Page 55: ...17 Nov 2011 Y NISHIYAMA 17 Nov 2011 Y NISHIYAMA...
Page 56: ...17 Nov 2011 Y NISHIYAMA 17 Nov 2011 Y NISHIYAMA...
Page 57: ...17 Nov 2011 Y NISHIYAMA 17 Nov 2011 Y NISHIYAMA...
Page 58: ...8 Mar 2016 H MAKI...