JGASUK-IOMM-2015-2
Fulton Ltd
Page 3
INSTALLATION - 2
2.1
GENERAL
The installation of a J Series gas fired steam boiler should be carried out by competent personnel
in accordance with all relevant safety regulations. It is the responsibility of the installer to ensure
that these regulations are complied with.
The requirements and instructions contained in this section generally relate to the boilers being
installed to operate on natural or manufactured gas. Where the boiler is to operate on L.P. Gas,
special reference should be made to
Section 2.10 - Gas Supply
, and
Section 2.16 L.P. Gas
Supply
.
2.2
SITING
(Reference should be made to Utilisation Procedures as stated in IGE/UP/10 Part 1
Communication 1676, and in particular to Section 5, Location of Appliances).
The boiler house should be sufficiently sized to allow easy and safe access to all parts of the
boiler for operational and maintenance purposes.
Reference should be made to
Appendix A - TI-117-J Series Dimensions & Specification
to
ascertain the relevant dimensions and weights, special note should be taken of the required
vertical clearance required for maintenance.
WARNING
Maintenance on the burner assembly requires the area directly above and to one side of the boiler must
not be obstructed with pipework or equipment which would interfere with the removal of the complete
burner unit. Care should be taken on installation of the boiler to ensure this area remains clear of
obstructions.
!
SECTION 2 - INSTALLATION
The flooring must be level, laid in a non-combustible material and be of sufficient strength to
support the boiler.
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...
Page 62: ...JGASUK IOMM 2015 2 Fulton Ltd Page 56 ...